Overview
Be part of the nation’s only repository for the disposal of nuclear waste known as Transuranic (TRU) waste.
Salado Isolation Mining Contractors, LLC (SIMCO), managing and operating contractor of the Waste Isolation Pilot Plant (WIPP) is currently seeking a qualified individual to serve as a
Geotechnical Engineer and join our team located in Carlsbad, New Mexico.
Responsibilities
The successful candidate will perform underground mining/geotechnical engineering activities including design, development, and test duties and responsibilities. Train and qualify as an Cognizant Engineer on AU07 – Geomechanical Monitoring system. Perform daily interface activities and assist with planning an execution of underground mining activities. Evaluate and select appropriate methods and procedures to produce economical and efficient applications. Analyze and recommend incorporation of technological advancements in techniques, principles, theories, equipment, and utilization. Collaborate with project engineers and management to determine technical requirements and performance objectives of assigned projects.
Minimum Requirements
These requirements must be met to be considered for this posting. Uploaded resumes and completed applications are the means of determination. Applicants are encouraged to provide a cover letter that addresses each of the minimum requirements and as many of the desired skills as applicable to their expertise.
Education And Experience
- Bachelor’s degree with five (5) years of related experience is required.
- Must be 18 years of age.
- Must be authorized to work and remain in the United States without SIMCO visa sponsorship now or in the future.
- Must be able to obtain a Department of Energy badge for access to the WIPP Site (even if teleworking, must still be able to comply with security requirements to obtain a badge).
- Non-U.S. citizens from countries identified by the Department of Energy as posing heightened security concerns—including sensitive countries, state sponsors of terrorism, countries of risk, and other designated countries –are subject to additional security requirements that limit site access.
Preferred Requirements
- Bachelor’s degree in Mining, Geotechnical or Mechanical Engineering is desired.
- Experience with the design, installation and monitoring of ground control techniques in salt rock excavations is preferred.
- Experience with managing geotechnical field inspections and monitoring systems is preferred.
- Experience with Campbell Scientific programming is a plus.
- Previous WIPP Project experience is a plus.
Salary Range
$89,233 to $157,968 per year. Exempt grade level(s) 31-33. The specific salary offered to a candidate will be influenced by a variety of factors, particularly the candidate’s relevant experience and education.
What We Offer Medical, dental and vision insurance:
- Coverage on date of hire
- Surgical concierge service
- EAP services including wellness plans, estate planning, financial counseling and more
Modern work arrangements to include 4-day workweeks (four 10-hour days)*Relocation assistance*Shuttle commuter service from the local areasPaid time off (PTO) and paid holidaysTuition reimbursement programOn-site fitness center and other wellness support including some public gym membership reductionsCompany paid short term disabilityCompany paid life insurance (1x annual salary)Pension plan that provides monthly annuity after retirement and 401(k) with .50 matching up to 6%Voluntary benefits of:
- Accident, Critical Illness, and Hospital Indemnity
- Long-term disability program
- Health and Flexible savings accounts
- Life and accidental death and dismemberment insurance
- These benefits vary by position.
Equal Opportunity
Equal employment opportunity, including veterans and individuals with disabilities.
If you are an applicant with a disability who requires a reasonable accommodation to complete any part of the application process or are limited in the ability—or unable to use—the online application system and need an alternative method for applying, you may contact (575) 234-8490 or email wipprecruiting@wipp.doe.gov for assistance. Upon receipt of this information, we will respond to you promptly to obtain more information about your request.
Reviews, and tests for the absence of any illegal drug as defined in 10 CFR 707.4, will be conducted by SIMCO and a background investigation by the Federal government may be required to obtain an access authorization prior to employment, and subsequent reinvestigations may be required.
Posting Duration: This posting will be open for application submissions for a minimum of seven (7) calendar days, including the posting date. SIMCO reserves the right to extend the posting date at any time.